Criteria selected:
Facility ID = 8515499
Facility Details:
Program = TK
Facility Name = CIRCLE K #2709802
Address = 5025 TAMPA RD
City = OLDSMAR
District/County = SWD / PINELLAS

Records on this page = 50 of 226
     
Your search returned these documents available online from DEP's unrestricted EDMS catalogs:
Click on the View link below to open a specific document. Export CSV Data
Document Date Document Type Document Subject Permit / Application Number File Type and Size View
02-27-2025 WORK ORDER - TASK ASSIGNMENT RELATED CHANGE ORDER 1 - PO C45E9A / .pdf  -  1.4 MB arrow
12-19-2024 INVOICE RELATED PO C45E9A T2 INVOICE / .pdf  -  1.8 MB arrow
12-18-2024 SITE ASSESSMENT RELATED C45E9A T2 IAR REVIEW LTR / .pdf  -  993.0 KB arrow
12-11-2024 SITE ASSESSMENT RELATED C45E9A T2 INTERIM / .pdf  -  4.3 MB arrow
12-06-2024 LAB ANALYTICAL REPORTS 8515499_20241022_PR_REDD_UPLOAD / .pdf  -  2.4 KB arrow
10-22-2024 OUTGOING CORRESPONDENCE ELECTRONIC DATA DELIVERABLE SUBMISSION RECEIPT - 8515499_20241022 / .pdf  -  35.7 KB arrow
10-22-2024 LAB ANALYTICAL REPORTS ZIPPED ADAPT FILE - 8515499_10/22/2024_PRZDD.ZIP / .zip  -  28.0 KB arrow
10-04-2024 OUTGOING CORRESPONDENCE EMAIL NOTIFICATION OF VIOLATION RESOLUTION / .pdf  -  37.3 KB arrow
09-30-2024 SITE ASSESSMENT RELATED C45E9A T1 HASP REVIEW LTR / .pdf  -  995.5 KB arrow
09-30-2024 FIELD WORK NOTIFICATION C45E9A SAMPLING 10.22.24 / .pdf  -  785.4 KB arrow
09-25-2024 SITE ASSESSMENT RELATED C45E9A T1 HASP / .pdf  -  1.4 MB arrow
09-11-2024 WORK ORDER - TASK ASSIGNMENT RELATED PURCHASE ORDER - PO C45E9A / .pdf  -  1.4 MB arrow
08-30-2024 OUTGOING CORRESPONDENCE EMAIL NOTIFICATION OF COMPLIANCE ISSUE / .pdf  -  36.9 KB arrow
08-30-2024 NONCOMPLIANCE RELATED COMPLIANCE ASSISTANCE OFFER LETTER - COMPLIANCE ASSISTANCE OFFER LETTER / .pdf  -  638.1 KB arrow
08-30-2024 INSPECTION RELATED INSPECTION REPORT - COMPLIANCE FINAL / .pdf  -  3.1 MB arrow
08-29-2024 PROPOSAL RELATED NELAP 8515499 STATEMENT / .pdf  -  343.0 KB arrow
08-27-2024 WARNING LETTER WARNING LETTER - WL24-166TKSWD / .pdf  -  535.2 KB arrow
08-27-2024 WARNING LETTER WARNING LETTER - WL24-166TKSWD /   SUPP arrow
08-21-2024 PROPOSAL RELATED PRP ASSIGNMENT OF WORK FOR CONTINUED SCOPE AT FACILITY # 528515499 / .msg  -  2.4 MB arrow
10-31-2023 NONCOMPLIANCE RELATED ATTACHMENT - DW PIPING STP SUMP REPAIR 20231009 / .pdf  -  373.6 KB arrow
06-21-2023 NONCOMPLIANCE RELATED ATTACHMENT - PLACARD FOR 2022-2023 / .pdf  -  70.0 KB arrow
06-21-2023 INSPECTION RELATED ATTACHMENT - 2023 TESTING RESULTS / .pdf  -  393.7 KB arrow
02-27-2023 NONCOMPLIANCE RELATED COMPLIANCE ASSISTANCE OFFER LETTER CIRCLE-K #2709802 / .pdf  -  611.6 KB arrow
02-27-2023 INSPECTION RELATED INSPECTION REPORT - COMPLIANCE FINAL / .pdf  -  4.2 MB arrow
01-30-2023 INSPECTION RELATED ATTACHMENT - NOI EMAIL / .pdf  -  791.3 KB arrow
02-11-2021 NONCOMPLIANCE RELATED RTC LETTER 2.11.21 / .pdf  -  249.2 KB arrow
02-11-2021 NONCOMPLIANCE RELATED ATTACHMENT - RECVD 12.16.20 - FILL COVERS PAINTED / .jpg  -  684.3 KB arrow
11-25-2020 NONCOMPLIANCE RELATED ATTACHMENT - WATER REMOVED FROM SUMPS, PIPING 2ND PORTS OPENED / .pdf  -  13.2 KB arrow
11-25-2020 NONCOMPLIANCE RELATED ATTACHMENT - RRBD 11.24.20 / .pdf  -  242.1 KB arrow
11-25-2020 NONCOMPLIANCE RELATED ATTACHMENT - PREMIUM SB PRIMARY REPLACED AND TESTED / .pdf  -  13.1 KB arrow
11-25-2020 NONCOMPLIANCE RELATED ATTACHMENT - PREMIUM PRIMARY REPLACED PASSED INTEGRITY TEST / .pdf  -  13.1 KB arrow
10-13-2020 DISCHARGE REPORTING RELATED PREMIUM SB FAILED INTEGRITY TESTING / .pdf  -  900.7 KB arrow
09-21-2020 NONCOMPLIANCE RELATED CAO LETTER 9.21.20 / .pdf  -  52.7 KB arrow
09-21-2020 INSPECTION RELATED INSPECTION REPORT - COMPLIANCE FINAL / .pdf  -  3.6 MB arrow
09-21-2020 INSPECTION RELATED ATTACHMENT - VEEDER-ROOT TAPES 9.18.20 / .pdf  -  29.2 KB arrow
09-18-2020 INSPECTION RELATED ATTACHMENT - INSPECTION NOTIFICATION 8.28.20 / .pdf  -  708.6 KB arrow
12-04-2019 INSTALLATION RELATED ATTACHMENT - PRIMARY SB REPLACED INT TEST 11.1.19 / .pdf  -  19.3 KB arrow
10-22-2019 DISCHARGE REPORTING RELATED INF 10.22.19 / .pdf  -  877.5 KB arrow
09-18-2019 DISCHARGE REPORTING RELATED ATTACHMENT - CIRCLE_K_2709802_123823_07_MAY_2018_RESULTS / .pdf  -  13.0 KB arrow
09-18-2019 DISCHARGE REPORTING RELATED ATTACHMENT - 2018-05-25_2709802_BOI TEST / .pdf  -  112.0 KB arrow
02-04-2019 CONTRACTOR PERFORMANCE EVALUATION CPE-AEE327 / .pdf  -  328.7 KB arrow
06-25-2018 NONCOMPLIANCE RELATED RTC LETTER 6.25.18 / .pdf  -  131.2 KB arrow
06-25-2018 NONCOMPLIANCE RELATED ATTACHMENT - SPILL BUCKET BOI AND PCW REMOVAL_07_MAY_2018.PDF / .pdf  -  16.6 KB arrow
06-25-2018 NONCOMPLIANCE RELATED ATTACHMENT - 2018-05-25_2709802_BOI TEST / .pdf  -  112.0 KB arrow
06-22-2018 INSPECTION RELATED UPDATED SITE INSPECTION FORM & PHOTOS / .pdf  -  3.5 MB arrow
06-22-2018 INSPECTION RELATED SITE INSPECTION FORM & PHOTOS / .pdf  -  3.5 MB arrow
05-02-2018 NONCOMPLIANCE RELATED CAO LETTER 5.2.18 / .pdf  -  115.9 KB arrow
05-02-2018 INSPECTION RELATED INSPECTION REPORT - COMPLIANCE FINAL / .pdf  -  647.7 KB arrow
05-01-2018 DISCHARGE REPORTING RELATED REGULAR-WEST AND PREM TANKS FAILED BOI / .pdf  -  877.6 KB arrow
04-25-2018 DISCHARGE REPORTING RELATED ATTACHMENT - TANK TECH REPAIR AND BOI TESTING 8.19.17 / .pdf  -  195.5 KB arrow

Disclaimer: The Florida Department of Environmental Protection (FDEP) has made a reasonable effort to ensure that the information provided is up-to-date and comprehensive but cannot guarantee the accuracy or completeness of the data. Any specific, missing information may be obtained through a public records request. For more information visit our Public Records web site.