Criteria selected:
Facility ID = MMR_FL0000124
Facility Details:
Program = MMR
Facility Name = PINEY POINT PHOSPHATES, INC - PINEY POINT CHEMICAL PLANT
Address = 13300 HIGHWAY 41 N
City = PALMETTO
District/County = SWPM / MANATEE

Records on this page = 50 of 732
     
Your search returned these documents available online from DEP's unrestricted EDMS catalogs:
Click on the View link below to open a specific document. Export CSV Data
Document Date Document Type Document Subject Permit / Application Number File Type and Size View
06-17-2022 PUBLIC NOTICES AFFIDAVIT OF PUBLICATION -CONCEPTUAL CLOSURE PLAN-OGSS FL0000124007IWF / FL0000124007   SUPP arrow
06-17-2022 CONSENT ORDER AFFIDAVIT OF PUBLICATION -CONCEPTUAL CLOSURE PLAN-OGSS FL0000124007IWF / FL0000124007   SUPP arrow
06-17-2022 CLOSURE RELATED AFFIDAVIT OF PUBLICATION -CONCEPTUAL CLOSURE PLAN-OGSS FL0000124007IWF / FL0000124007 .pdf  -  593.7 KB arrow
06-08-2022 REVIEW RELATED APPROVAL NOTIFICATION FOR OGSS CLOSURE PLAN FL0000124007IWF / FL0000124007   SUPP arrow
06-08-2022 CLOSURE RELATED APPROVAL NOTIFICATION FOR OGSS CLOSURE PLAN FL0000124007IWF / FL0000124007 .pdf  -  720.1 KB arrow
03-31-2022 MONITORING PLANS AND REPORTS RELATED PM SAMPLING RESULTS / .xlsx  -  4.2 MB arrow
03-31-2022 MONITORING PLANS AND REPORTS RELATED PIEZOMETER READINGS / .pdf  -  291.8 KB arrow
03-31-2022 MONITORING PLANS AND REPORTS RELATED DAILY UPDATE / .pdf  -  18.1 MB arrow
03-31-2022 INCOMING CORRESPONDENCE DAILY REPORTS FROM POTW PHOSFREE / .pdf  -  252.4 KB arrow
03-30-2022 INCOMING CORRESPONDENCE CONDUCTIVITY AT STRUCTURE 1 AND CLEANOUTS MAR 30 2022 / .pdf  -  2.9 MB arrow
03-29-2022 MONITORING PLANS AND REPORTS RELATED REVISED NGSS LEAK REPAIRS / .pdf  -  1.5 MB arrow
03-29-2022 MONITOR WELL RELATED PIEZOMETER READINGS UP TO 3-29-22 / .pdf  -  291.4 KB arrow
03-28-2022 INCOMING CORRESPONDENCE POTW DAILY UPDATES MAR 2022 / .pdf  -  250.8 KB arrow
03-24-2022 INCOMING CORRESPONDENCE REPAIR RELATED FEATURE 1 NGSS / .pdf  -  320.4 KB arrow
03-23-2022 INCOMING CORRESPONDENCE RELATES TO NGSS BOX OUTLINE / .pdf  -  2.3 MB arrow
03-22-2022 INCOMING CORRESPONDENCE ECO OCEAN SIDESCAN SURVEY OF NGSS 3/20/2022 / .pdf  -  3.1 MB arrow
03-21-2022 INCOMING CORRESPONDENCE NGSS LEAK REPAIR STEPS DRAFT / .pdf  -  1.1 MB arrow
03-21-2022 INCOMING CORRESPONDENCE CONDUCTIVITY AT STRUCTURE 1 AND CLEANOUTS MAR 21 2022 / .pdf  -  2.9 MB arrow
03-21-2022 CHEMICAL AND RADIOLOGICAL RELATED SAMPLING DATA FOR CLEANOUTS, PONDS, STRUCTURES / .xlsx  -  4.0 MB arrow
03-20-2022 MONITORING PLANS AND REPORTS RELATED ECHO OCEAN SIDESCAN OF NGSS / .pdf  -  1.4 MB arrow
03-17-2022 INCOMING CORRESPONDENCE REPAIR RELATED NGSS. BOX PLACEMENT / .pdf  -  7.3 MB arrow
03-16-2022 CLOSURE RELATED FL0000124-PINEY POINT PHOSPHOGYPSUM STACK SYSTEM / .pdf  -  270.7 KB arrow
03-15-2022 INCOMING CORRESPONDENCE MAPPING RELATED FEATURE 1 NGSS / .pdf  -  1.5 MB arrow
03-11-2022 INCOMING CORRESPONDENCE PROPOSED KELLY WELL CONSTRUCTION NGSS / .pdf  -  988.5 KB arrow
03-10-2022 INCOMING CORRESPONDENCE REPAIR RELATED NGSS. DEPRESSION SKETCH / .pdf  -  5.9 MB arrow
03-08-2022 INCOMING CORRESPONDENCE RELATES TO NGSS BOX OUTLINE / .pdf  -  2.5 MB arrow
03-07-2022 INCOMING CORRESPONDENCE CONDUCTIVITY AT STRUCTURE 1 AND CLEANOUTS MAR 7 2022 / .pdf  -  1.1 MB arrow
02-28-2022 MONITOR WELL RELATED PIEZOMETER READINGS UP TO 2-28-22 / .pdf  -  246.8 KB arrow
02-28-2022 INCOMING CORRESPONDENCE POTW DAILY UPDATES FEB 2022 / .pdf  -  241.8 KB arrow
02-28-2022 INCOMING CORRESPONDENCE DAILY UPDATES FEBRUARY 2022 / .pdf  -  1.2 MB arrow
02-28-2022 DISCHARGE REPORTING RELATED DAILY WATER REPORTS FEBRUARY 2022 / .xlsx  -  26.7 KB arrow
02-28-2022 DISCHARGE REPORTING RELATED BASIN TWO CULVERT FEBRUARY 2022 / .xlsx  -  477.1 KB arrow
02-24-2022 CHEMICAL AND RADIOLOGICAL RELATED SAMPLING DATA FOR CLEANOUTS, PONDS, STRUCTURES / .xlsx  -  3.7 MB arrow
02-17-2022 MONITORING RELATED SLUDGE SAMPLING LPWS / .zip  -  13.6 MB arrow
01-31-2022 MONITOR WELL RELATED PIEZOMETER READINGS UP TO 1-31-22 / .pdf  -  246.6 KB arrow
01-31-2022 INCOMING CORRESPONDENCE ECOVAP TEST PROTOCOLS / .pdf  -  1.1 MB arrow
01-31-2022 INCOMING CORRESPONDENCE DAILY UPDATES JANUARY 2022 / .pdf  -  1.8 MB arrow
01-31-2022 DISCHARGE REPORTING RELATED DAILY WATER REPORTS JANUARY 2022 / .xlsx  -  27.1 KB arrow
01-30-2022 INCOMING CORRESPONDENCE POTW DAILY UPDATES NOV 2022 / .pdf  -  235.8 KB arrow
01-29-2022 INCOMING CORRESPONDENCE CONDUCTIVITY AT STRUCTURE 1 AND CLEANOUTS JAN 29 2022 / .pdf  -  1.0 MB arrow
01-27-2022 DISCHARGE REPORTING RELATED BASIN TWO CULVERT JANUARY 2022 / .xlsx  -  460.3 KB arrow
01-27-2022 CHEMICAL AND RADIOLOGICAL RELATED SAMPLING DATA FOR CLEANOUTS, PONDS, STRUCTURES / .xlsx  -  3.0 MB arrow
01-26-2022 INCOMING CORRESPONDENCE CONDUCTIVITY AT STRUCTURE 1 AND CLEANOUTS JAN 26 2022 / .pdf  -  2.8 MB arrow
01-21-2022 INCOMING CORRESPONDENCE SKETCH OF FEATURE 1 IN NGSS / .pdf  -  3.9 MB arrow
01-19-2022 INCOMING CORRESPONDENCE MAPPING RELATED FEATURE 1 NGSS / .pdf  -  5.4 MB arrow
01-19-2022 GROUNDWATER MONITORING RELATED PIEZO WATER SAMPLES 1/19/22 / .xlsx  -  9.6 KB arrow
01-18-2022 MONITOR WELL RELATED PIEZOMETER READINGS UP TO 1-18-22 / .pdf  -  296.1 KB arrow
01-13-2022 INCOMING CORRESPONDENCE NGSS AS BUILTS FROM TOM LETO: RELATES TO NGSS LEAK / .pdf  -  2.1 MB arrow
01-11-2022 MONITOR WELL RELATED PIEZOMETER READINGS UP TO 1-11-22 / .pdf  -  252.2 KB arrow
01-07-2022 INCOMING CORRESPONDENCE SEAM GRID COORDS / .pdf  -  1.1 MB arrow

Disclaimer: The Florida Department of Environmental Protection (FDEP) has made a reasonable effort to ensure that the information provided is up-to-date and comprehensive but cannot guarantee the accuracy or completeness of the data. Any specific, missing information may be obtained through a public records request. For more information visit our Public Records web site.