Criteria selected:
Facility ID = MMR_FL0036421
Facility Details:
Program = MMR
Facility Name = MOSAIC FERTILIZER, LLC - NEW WALES CONCENTRATES
Address = 3095 COUNTY ROAD 640 WHWY 640 AT HILLS/POLK CO. LINE
City = MULBERRY
District/County = SWPM / POLK

Records on this page = 50 of 1857
     
Your search returned these documents available online from DEP's unrestricted EDMS catalogs:
Click on the View link below to open a specific document. Export CSV Data
Document Date Document Type Document Subject Permit / Application Number File Type and Size View
04-26-2005 OPERATIONS RELATED APRIL 2005: PERFORMANCE MONITORING REPORTS EXPANSION AREA CUT-OFF WALL / .pdf  -  1.6 MB arrow
04-26-2005 GROUNDWATER MONITORING RELATED APRIL 2005: PERFORMANCE MONITORING REPORTS EXPANSION AREA CUT-OFF WALL /   SUPP arrow
04-04-2005 ANNUAL REPORT RELATED NEW WALES / .pdf  -  19.4 MB arrow
03-10-2005 HISTORICAL PERMIT RECORDS NEW WALES / .pdf  -  9.7 MB arrow
11-30-2004 INCOMING CORRESPONDENCE NOTIFICATION OF NAME CHANGE : FROM IMC PHOSPHATES COMPANY TO MOSAIC PHOSPHATES COMPANY EFFECTIVE OCTOBER 22, 2004 / .pdf  -  363.2 KB arrow
11-29-2004 INSPECTION RELATED 2001 - ANNUAL INSPECTION - COOLING POND SYSTEM AND EMERGENCY HOLDING POND / .pdf  -  6.2 MB arrow
10-21-2004 OPERATIONS RELATED OCTOBER 2004: PERFORMANCE MONITORING REPORTS EXPANSION AREA CUT-OFF WALL / .pdf  -  2.8 MB arrow
10-21-2004 GROUNDWATER MONITORING RELATED OCTOBER 2004: PERFORMANCE MONITORING REPORTS EXPANSION AREA CUT-OFF WALL /   SUPP arrow
09-04-2004 ANNUAL REPORT RELATED NEW WALES / .pdf  -  10.8 MB arrow
08-17-2004 REPAIRS - MAINTENANCE RELATED HDPE LINER DAMAGE REPAIRS -PHASE I SEEPAGE DITCH /   SUPP arrow
08-17-2004 OPERATIONS RELATED HDPE LINER DAMAGE REPAIRS -PHASE I SEEPAGE DITCH / .pdf  -  649.0 KB arrow
08-16-2004 TRANSFER TO OPERATION RELATED COMPLETION OF CONSTRUCTION: NICHOLS TO NEW WALES PROCESS WATER PIPELINE / .pdf  -  290.8 KB arrow
08-16-2004 MODIFICATION RELATED COMPLETION OF CONSTRUCTION: NICHOLS TO NEW WALES PROCESS WATER PIPELINE /   SUPP arrow
06-11-2004 TRANSFER TO OPERATION RELATED APPROVAL FOR UTILITY POND DREDGING / .pdf  -  8.2 MB arrow
06-11-2004 ENGINEERING REPORTS APPROVAL FOR UTILITY POND DREDGING /   SUPP arrow
06-08-2004 INCOMING CORRESPONDENCE COST CLOSURE FOR NEW WALES COOLING POND CLOSURE IN 1998 DOLLARS / .pdf  -  238.3 KB arrow
06-07-2004 HISTORICAL PERMIT RECORDS NEW WALES / .pdf  -  6.1 MB arrow
04-19-2004 OPERATIONS RELATED APRIL 2004: PERFORMANCE MONITORING EXPANSION AREA CUT-OFF WALL /   SUPP arrow
04-19-2004 ENGINEERING REPORTS APRIL 2004: PERFORMANCE MONITORING EXPANSION AREA CUT-OFF WALL / .pdf  -  1.7 MB arrow
04-12-2004 PERMIT APPLICATION RELATED PERMIT MODIFICATION APPLICATION : FL0036421-008 AND 009: RAIL CAR WASH STATION AND TRANSFER OF LIME TREATED WATER FROM NICHOLS TO NEW WALES. / .pdf  -  15.9 MB arrow
04-12-2004 OUTGOING CORRESPONDENCE PERMIT MODIFICATION: CONSTRUCTION AND SUBSEQUENT OPERATION OF RAIL CAR WASHING STATION AND TRANSFER OF WASTER WATER FROM NICHOLS TO NEW WAALES ROCK CT / .pdf  -  2.9 MB arrow
04-12-2004 HISTORICAL PERMIT RECORDS PERMIT MODIFICATION: CONSTRUCTION AND SUBSEQUENT OPERATION OF RAIL CAR WASHING STATION AND TRANSFER OF WASTER WATER FROM NICHOLS TO NEW WAALES ROCK CT /   SUPP arrow
02-11-2004 PERMIT APPLICATION RELATED PERMIT APPLICATION : FL0036421-007 -IWIS/NR: INCLUDES INITIAL RAI / .pdf  -  44.0 MB arrow
02-09-2004 ANNUAL REPORT RELATED NEW WALES / .pdf  -  9.6 MB arrow
02-04-2004 HISTORICAL PERMIT RECORDS APPLICATION FOR FDEP PERMIT RENEWAL AND SUPPORTING ENGINEERING INFORMATION / .pdf  -  35.2 MB arrow
01-08-2004 WARNING LETTER COMPLETION OF REMEDIAL ACTION PLAN: WARNING LETTER #03-002PM53BMR /   SUPP arrow
01-08-2004 INCOMING CORRESPONDENCE COMPLETION OF REMEDIAL ACTION PLAN: WARNING LETTER #03-002PM53BMR / .pdf  -  547.6 KB arrow
01-07-2004 REPORTS RELATED 2003-2005 APPROVALS TO DISPOSE WASTE IN LINED PHOSPHOGYSUM SOUTH STACK /   SUPP arrow
01-07-2004 OUTGOING CORRESPONDENCE 2003-2005 APPROVALS TO DISPOSE WASTE IN LINED PHOSPHOGYSUM SOUTH STACK /   SUPP arrow
01-07-2004 OPERATIONS RELATED 2003-2005 APPROVALS TO DISPOSE WASTE IN LINED PHOSPHOGYSUM SOUTH STACK / .pdf  -  1.3 MB arrow
01-06-2004 OPERATIONS RELATED ACCIDENTAL DAMAGE TO HDPE LINER DURING CONSTRUCTION: DECEMBER 19, 2003 AND JUNE 20, 2003: PHASE II PHOSPHOGYPSUM STACK / .pdf  -  1008.2 KB arrow
01-06-2004 MITIGATION RELATED ACCIDENTAL DAMAGE TO HDPE LINER DURING CONSTRUCTION: DECEMBER 19, 2003 AND JUNE 20, 2003: PHASE II PHOSPHOGYPSUM STACK /   SUPP arrow
12-18-2003 PLANS WATER CONSUMPTION BY SPRAY EVAPORATION / .pdf  -  806.9 KB arrow
11-24-2003 OPERATIONS RELATED CERTIFICATE OF COMPLETION OF CONSTRUCTION : PHASE II GYPSUM STACK- SOUTH COMPARTMENT OF WEST AREA / .pdf  -  568.2 KB arrow
11-24-2003 OPERATION AND MAINT - REMEDIAL ACTION RPT RELATED CERTIFICATE OF COMPLETION OF CONSTRUCTION : PHASE II GYPSUM STACK- SOUTH COMPARTMENT OF WEST AREA /   SUPP arrow
11-19-2003 ANNUAL REPORT RELATED NEW WALES / .pdf  -  7.8 MB arrow
10-31-2003 OPERATIONS RELATED OCTOBER 2003: PERFORMANCE MONITORING REPORTS EXPANSION AREA CUT-OFF WALL / .pdf  -  1.7 MB arrow
10-31-2003 GROUNDWATER MONITORING RELATED OCTOBER 2003: PERFORMANCE MONITORING REPORTS EXPANSION AREA CUT-OFF WALL /   SUPP arrow
09-24-2003 SPILL RELATED SUMMARY OF TEST RESULTS & RECOMMENDED REMEDIAL ACTION FOR AREAS IMPACTED BY LIMITED ACCIDENTAL PROCESS WTR RELEASE INTO PORTIONS OF AREAS 30C & K-GAC / .pdf  -  3.3 MB arrow
08-08-2003 CONSENT ORDER MOSAIC FERTILIZER, LLC - NEW WALES CONCENTRATES / .pdf  -  40.7 MB arrow
07-22-2003 OPERATIONS RELATED UPDATED REGULATORY TRIGGER LEVELS : DUE TO ABOVE NORMAL RAINFALL AND ADVENT OF HURRICANES /   SUPP arrow
07-22-2003 ALTERNATE PROCEDURE - VARIANCE RELATED UPDATED REGULATORY TRIGGER LEVELS : DUE TO ABOVE NORMAL RAINFALL AND ADVENT OF HURRICANES / .pdf  -  2.3 MB arrow
07-09-2003 SPILL RELATED HDPE LINER TEAR: PHASE 1 STACK SEEPAGE DITCH /   SUPP arrow
07-09-2003 INCIDENT OR MALFUNCTION REPORTING RELATED HDPE LINER TEAR: PHASE 1 STACK SEEPAGE DITCH / .pdf  -  549.0 KB arrow
07-02-2003 PERMIT APPLICATION RELATED NEW WALES / .pdf  -  3.4 MB arrow
06-30-2003 SPILL RELATED RELEASE OF WATER OFF GYPSUM COVER: PHASE II GYPSUM STACK /   SUPP arrow
06-30-2003 OPERATIONS RELATED LETTER OF COMPLETION: SUMP AREA WATER SHED REDUCTION -RULE 62-672.600(4),F.A.C. / .pdf  -  3.0 MB arrow
06-30-2003 INCOMING CORRESPONDENCE RELEASE OF WATER OFF GYPSUM COVER: PHASE II GYPSUM STACK / .pdf  -  2.0 MB arrow
06-30-2003 INCOMING CORRESPONDENCE LETTER OF COMPLETION: SUMP AREA WATER SHED REDUCTION -RULE 62-672.600(4),F.A.C. /   SUPP arrow
06-27-2003 INSPECTION RELATED 2002 ANNUAL DAM INSPECTION SOUTH GYPSUM STACK / .pdf  -  10.0 MB arrow

Disclaimer: The Florida Department of Environmental Protection (FDEP) has made a reasonable effort to ensure that the information provided is up-to-date and comprehensive but cannot guarantee the accuracy or completeness of the data. Any specific, missing information may be obtained through a public records request. For more information visit our Public Records web site.