Manhole Overflow - 3884 Anglers Lane |
HURRICANE IRMA CAUSED LIFT STATION 15 TO LOSE POWER AND BACKUP GENERATOR DID NOT COME ON WHICH CAUSED THE UPSTREAM MANHOLE(S) TO OVERFLOW. STAFF CHANGED OUT THE GENERATOR AND GOT THE LIFT STATION RUNNING AGAIN. STAFF IS LOOKING INTO THE CAUSE FOR GENERATOR FAILING TO START. |
09/13/2017 04:34 PM |
FL0026603 - Lift Station #15 |
3476 Adrian Ave.; Largo FL; 33774 |
Pinellas |
Vivian Gleaves |
Environmental Manager |
vgleaves@largo.com |
(727) 518-3061 |
Wastewater Department Manager |
Vivian Gleaves |
(727) 518-3061 |
vgleaves@largo.com |
27.900027
|
-82.826005
|
09/11/2017 11:35 AM |
No |
09/11/2017 02:00 PM |
|
|
Incident Location
|
Manhole Overflow - 3884 Anglers Lane |
HURRICANE IRMA CAUSED LIFT STATION 15 TO LOSE POWER AND BACKUP GENERATOR DID NOT COME ON WHICH CAUSED THE UPSTREAM MANHOLE(S) TO OVERFLOW. STAFF CHANGED OUT THE GENERATOR AND GOT THE LIFT STATION RUNNING AGAIN. STAFF IS LOOKING INTO THE CAUSE FOR GENERATOR FAILING TO START. |
09/13/2017 04:34 PM |
FL0026603 - Lift Station #15 |
3476 Adrian Ave.; Largo FL; 33774 |
Pinellas |
Vivian Gleaves |
Environmental Manager |
vgleaves@largo.com |
(727) 518-3061 |
Wastewater Department Manager |
Vivian Gleaves |
(727) 518-3061 |
vgleaves@largo.com |
27.900027
|
-82.826005
|
09/11/2017 11:35 AM |
No |
09/11/2017 02:00 PM |
|
|
Incident Location
|
PCU DS-021 9.11.17 |
Manholes overflowed associated to pump station 021 located at 10137 118th Avenue N., Largo. Started started at 11:01 ended at 11:30 on 9/11/17. Samples were collected on 9/12/17 ~ 1230 PM and signs posted; bacteriological results passed. Generators in place and/or rotated until power was restored - debris clean-up as needed. Waterway Affected: Lake Seminole. Spill amount: 29,755 gallons. Cause of release: Hurricane Irma resulting in power failure at pump station.
Pump Station 021 Power Outage - calls from
11755 101st Street
10136 118th Avenue
|
09/13/2017 04:29 PM |
South Cross Bayou AWRF (FL0040436) |
7401 54th Avenue North, St Petersburg, FL 33709-1374; St Petersburg FL; 33709 |
Pinellas |
Sheri Lovely |
Technical Project Coordinator |
slovely@pinellascounty.org |
(727) 582-2379 |
Water Quality Division Employee |
Megan Ross |
(727) 582-7020 |
mross@pinellascounty.org |
27.878624
|
-82.779256
|
09/11/2017 11:00 AM |
No |
09/11/2017 11:30 AM |
N |
|
Incident Location
|
Manhole Overflow - 1754 Indian Rocks Road |
HURRICANE IRMA CASUED LIFT STATION 15 TO LOSE POWER. BACKUP GENERATOR DID NOT COME ON AS EXPECTED AND MANHOLE OVERFLOWED INTO WATERWAY. STAFF WERE ABLE TO CHANGE THE GENERATOR OUT AND GET THE STATION WORKING AGAIN, CAUSING THE OVERFLOW TO STOP. SAMPLES WILL BE COLLECTED AND SIGNS POSTED. |
09/13/2017 04:26 PM |
FL0026603 - Lift Station #15 |
3476 Adrian Ave.; Largo FL; 33774 |
Pinellas |
Vivian Gleaves |
Environmental Manager |
vgleaves@largo.com |
(727) 518-3061 |
Wastewater Department Manager |
Vivian Gleaves |
(727) 518-3061 |
vgleaves@largo.com |
27.901008
|
-82.824428
|
09/11/2017 10:40 AM |
No |
09/11/2017 02:00 PM |
|
|
Incident Location
|
Berth 13 Manifold Release, Port Everglades |
On September 13th, 2017 at 0300 in Berth 13 of Port Everglades, Florida, a gasket failed on the manifold valve causing discharge to intercostal waterway. The activity was shutdown immediately with a discharged volume of less than 25 gallons. The spill contractor was notified while the location of discharge was cleaned. Proper authorities were contacted. To finalize, the U.S. Coast Guard inspected and approved the cleanup efforts. The vessel commenced pumping thereafter.
|
09/13/2017 04:20 PM |
South Florida Petroleum Services, LLC. |
Berth 13, Port Everglades, Florida; Directions: Port Everglades, Berth 13; Hollywood FL |
Broward |
Riley Boyle |
Environmental & Regulatory Compliance Administrator |
riley.boyle@vecenergy.com |
(954) 278-9142 |
Authorized Representative |
Richard Vogel |
(954) 278-9131 |
richard.vogel@vecenergy.com |
26.091313
|
-80.122703
|
09/13/2017 03:00 AM |
No |
09/13/2017 03:05 AM |
|
|
Incident Location
|
loxahatchee river district |
2 inch force main was broke due to Hurricane Irma event; large tree when fell the root system pulled and broke pvc force main; when reported the section of force main was isolated by underground valve; area was caution taped off and lime disinfection; repair is pending; no visible sewage made to waterway and no storm basins present; was contained to small street and effected property |
09/13/2017 04:08 PM |
loxahatchee river district |
2500 jupiter park drive; jupiter FL; 33458 |
Palm Beach |
kevin skellenger |
field superintendent |
kevin.skellenger@lrced.org |
(561) 747-5709 |
field superintendent |
albrey arrington |
(561) 747-5700 |
albrey@lrecd.org |
26.953659
|
-80.120853
|
09/10/2017 12:00 AM |
No |
09/11/2017 10:00 AM |
|
|
Incident Location
|
Lift Station #2- Country Club Dr. |
Hurricane IRMA caused a power outage at Lift Station #2, which caused two City manholes located upstream, to overflow. |
09/13/2017 04:02 PM |
City of Largo WWRF |
; Directions: City Manhole #19-5095 and # 19-6010; located about 100 yards apart from each other off Country Club Dr. ; Largo FL |
Pinellas |
Donna Dessoir |
Environmental Control Supervisor |
dodessoi@largo.com |
(727) 507-4491 |
Environmental Control Supervisor |
Donna Dessoir |
(727) 507-4491 |
dodessoi@largo.com |
27.913837
|
-82.770583
|
09/11/2017 07:45 AM |
No |
09/11/2017 09:10 AM |
|
|
Incident Location
|
Event 127 |
Large amounts of debris came into the main plant lift station at once causing the pumps to rag up and the wastewater to spill out of a manhole and into a storm drain leading to Lake Conine. Staff installed a bypass pump and started working on clearing debris from the station. Cleaned up spill areas and spread lime. Ordered a larger bypass pump to pump the lift station to the headwork's during the lift station recovery process. |
09/13/2017 03:46 PM |
Wastewater Treatment Plant # 2 |
2746 Motor Pool Road; Winter Haven FL; 33881 |
Polk |
Terry Carver |
Wastewater Superintendent |
Tcarver@mywinterhaven.com |
(863) 291-5766 |
Operator of the Facility/Installation |
Terry Carver |
(863) 291-5766 |
tcarver@mywinterhaven.com |
28.055378
|
-81.72909
|
09/12/2017 10:00 AM |
No |
09/12/2017 11:30 AM |
|
|
Incident Location
|
Treated Etoniah Creek Water Release to Wetlands |
A cooling tower overflowed when an air valve failed in an open position due to a lockout at a nearby unloading station. The overflow consisted of approximately 3,000 gallons of treated Etoniah Creek water. The cooling tower water ran into a storm drain, a ditch and wooded area before reaching the storm water outfall to a nearby wetland. There is no associated risk to public health and safety or to the environment. |
09/13/2017 03:21 PM |
Georgia-Pacific Consumer Operations LLC |
215 County Road 216; Palatka FL; 32177 |
Putnam |
Ashleigh Thomas |
Environmental Engineer |
ashleigh.thomas@gapac.com |
(386) 227-8166 |
Environmental Engineer |
Ashleigh Thomas |
(386) 227-8166 |
ashleigh.thomas@gapac.com |
29.685746
|
-81.677047
|
09/13/2017 11:15 AM |
No |
09/13/2017 11:45 AM |
|
|
Incident Location
|
9130 Cypress Hollow Dr. |
Lift Station was out of power, causing sewage to back up into road from 2 manholes and a cleanout. |
09/13/2017 03:09 PM |
Cypress Hollow |
9130 Cypress Hollow Drive; Directions: Northlake Boulevard to Cypress Hollow development.; Palm Beach Gardens FL; 33418 - 4524 |
Palm Beach |
Brent Weidenhamer |
Wastewater Department Manager |
bweidenhamer@sua.com |
(561) 627-2900 |
Wastewater Department Manager of Seacoast Utility |
Brent Weidenhamer |
(561) 627-2900 |
bweidenhamer@sua.com |
26.831707
|
-80.137592
|
09/13/2017 09:00 AM |
No |
09/13/2017 10:30 AM |
|
|